We successfully delivered the system design, control panel manufacture, integration and commissioning of the Heat Pump, HVAC, Refrigeration Controls, Energy Metering and Lighting Control System at Waitrose Rickmansworth, for Paul Earl Electrical and Environmental.
The systems were networked together, integrated and optimised to ensure the building worked as efficiently as possible at all times, utilising the rejected heat from the refrigeration systems to heat the store.
Key Points:
- Comprehensive System Integration Success
- Optimal Efficiency Through Integration
- Utilising Rejected Heat Efficiently
- Successful Project Delivery Achievement
- Enhanced Control for Building Operations